Site Update – at 28 March 2023
Author name
Golf course construction site update with photos

Two views of the construction site taken on 22 March 2023. One from the edge of the twelfth fairway, just above the lefthand bunkers on the second hole. Identified as Camera 1. The other view, from Camera 2, is on the ‘Block’ to the left of the entrance from Beaconsfield Road.
As the entrance from Beaconsfield Road is no longer usable for construction vehicles an access road has been built from Mooney Street using excavated material. This road can be seen going around the pond. We are told that this phase of the work, digging and cutting out the sandstone rock, is slightly ahead of schedule, given all of the good weather.